Measured current, permitted current and the cable

How the current and PP columns of a Control Pilot log are read, what the permitted current is at each moment, and the checks PW-01 to PW-04 and PP-01.

Columns the analyzer reads

Next to the Control Pilot, a log may carry the phase currents i_l1 to i_l3, a DC current i_dc, the voltages u_l1 to u_l3 and u_dc, and the proximity pin as pp (a voltage) or pp_ohm (the resistance). A unit in brackets after the name, as in I_L1 [mA], is honoured.

A raw waveform export is turned into one RMS value per mains cycle: 20 ms at 50 Hz, 16.7 ms at 60 Hz, with the frequency found from the zero crossings of the signal. A DC channel is averaged instead. A processed log already holds RMS readings and they are taken as they are.

The permitted current

At every moment the permitted current is the smallest limit then in force, and the finding names the one that bound:

  • the PWM duty cycle, on AC, when it is outside the 5 percent window (IEC 61851-1 duty cycle to current)
  • the cable rating from the proximity pin, on AC
  • the maximum current the charger announced (EVSEMaxCurrent, EVSEMaximumCurrentLimit, EVSEMaximumChargeCurrent) and the car announced (EVMaxCurrent and its DC and ISO 15118-20 names), each until the next message replaces it
  • the power schedule: PMax divided by the nominal voltage and the phases that carried load on AC, by the DC voltage on DC

PW-01 fails when the measured current stays above that limit plus the margin in the profile (pw.currentMarginPct and pw.currentMarginA) for longer than pw.settlingTimeS. On AC the car sets its own draw, so the car is the likely party; on DC the charger regulates the current.

Start, stop and the meter

PW-02: current above pw.currentOnThresholdA before the Control Pilot reached state C, or before the charger answered PowerDelivery Start, means the outlet was live too early.

PW-03: after PowerDelivery Stop the current must fall below the threshold within pw.currentZeroTimeS (3 s, IEC 61851-1 Table A.6 sequences 9.1 and 10.1). At the C to B transition the car should already draw less than 1 A (sequence 7), and the charger opens its switching device within pw.switchOpenAfterCToBS (100 ms, sequence 8.1).

PW-04: the meter reading in ChargingStatusRes, CurrentDemandRes or the ISO 15118-20 charge loop never goes backwards. A meter that runs back breaks the receipt and, where calibration law applies, the bill.

The overcurrent margin is lab practice and stays marked for verification; IEC 61851-1 only says the car stays at or below the limit. Set it to the value your test specification uses.

The cable (proximity pin)

A detachable AC cable codes its current rating with a resistor between PP and PE, IEC 61851-1 Table B.2. The charger reads a class from a range of resistance around each nominal value:

Nominal resistorCable
1.5 kilohm13 A
680 ohm20 A
220 ohm32 A
100 ohm63 A (70 A single phase)

Above the highest range no plug is in; below the lowest the reading is an error and the charger must not supply power. Between two ranges the standard leaves the reading to the charger's designer: the analyzer takes the lower current, and PP-01 warns that the coding resistor may be out of tolerance. The ranges are in the limit profile (pp.range13AMinOhms and the others).

A logged PP voltage is turned into a resistance with the charger's measuring circuit, pp.supplyV and pp.pullUpOhms in the profile. That circuit is not standardised, so set it to the charger under test. PP-01 warns when the reading names no class, which a damaged cable or a short gives.

Sources

  • IEC 61851-1:2017, Tables A.6, A.8 and B.2