Before the first message
- Plug in: the car's resistor pulls the Control Pilot from A to B, and the charger answers with the 5 percent duty cycle that asks for digital communication.
- SLAC pairs the two modems, SDP gives the car the address and port of the charger, and the car opens the TCP connection: plain TCP for most DIN SPEC 70121 sessions and for external identification, TLS for Plug and Charge.
- The app handshake picks DIN SPEC 70121 or ISO 15118-2 for the rest of the session.
- The DC pins carry no voltage yet: the charger output is off and the car's DC contactors are open.
The layers below are covered in HomePlug Green PHY: powerline on the Control Pilot, SDP and V2GTP: finding the charger and framing messages and The app protocol handshake. From here on the car always asks and the charger always answers, one request at a time (SQ-02, SQ-03).
The sequence
- EV: SessionSetupReq, EVCCID; SessionID all zero
- EVSE: SessionSetupRes, OK_NewSessionEstablished, EVSEID and the SessionID for the rest of the session
- EV: ServiceDiscoveryReq
- EVSE: ServiceDiscoveryRes, payment options and energy transfer modes, for example DC_extended
- EV: PaymentServiceSelectionReq, ExternalPayment or Contract, and the charge service
- EV: AuthorizationReq, repeats while EVSEProcessing is Ongoing
- EV: ChargeParameterDiscoveryReq, DC_EVChargeParameter: the car's maximum voltage, current and power, energy request and state of charge
- EVSE: ChargeParameterDiscoveryRes, DC_EVSEChargeParameter: the charger's voltage, current and power range, and the SAScheduleList
- EV: CableCheckReq, connector locked, pilot in state C; repeats while the charger measures
- EVSE: CableCheckRes, EVSEProcessing Finished, EVSEIsolationStatus Valid
- EV: PreChargeReq, EVTargetVoltage is the battery voltage, EVTargetCurrent small; repeats
- EVSE: PreChargeRes, EVSEPresentVoltage approaches the target
- EV: PowerDeliveryReq, ChargeProgress Start; the car closes its contactors
- EV: CurrentDemandReq, EVTargetCurrent and EVTargetVoltage; repeats for the whole charge
- EVSE: CurrentDemandRes, EVSEPresentVoltage, EVSEPresentCurrent, the limit achieved flags and the meter
- EV: PowerDeliveryReq, ChargeProgress Stop; the charger ramps the current down
- EV: WeldingDetectionReq, repeats; the car watches the voltage fall with its contactors open
- EV: SessionStopReq, ChargingSession Terminate
- EVSE: SessionStopRes, then the TCP connection closes
What each step decides
| Exchange | What it decides | Typical faults | Checks |
|---|---|---|---|
| SessionSetup | The SessionID every later message carries | A SessionID that is not zero in the request of a new session, or one that changes later | SQ-04 |
| ServiceDiscovery | What the charger offers: payment options, energy transfer modes, extra services | The mode the car needs is not in the list | SQ-06, later |
| PaymentServiceSelection | The payment option and the services of this session | An option or service that was not offered | SQ-07, SQ-05 |
| Authorization | Whether this session may charge | EVSEProcessing Ongoing until the car gives up | TIM-02, see The session stops at authorization |
| ChargeParameterDiscovery | Both sets of limits and the schedule | FAILED_WrongChargeParameter; voltage ranges that do not overlap | SQ-05, SQ-06, TIM-02, the Negotiation tool |
| CableCheck | Whether the insulation of cable and inlet allows voltage to be applied | A loop that never finishes, an isolation Fault, a car still in state B | DC session stalls in CableCheck or PreCharge, Isolation monitoring and CableCheck |
| PreCharge | That the charger output matches the battery voltage before the contactors close | The output levels off below the target, or the loop runs out of time | DC-01 |
| PowerDelivery Start | The schedule tuple in use and the start of energy transfer | A tuple the charger did not send; FAILED_PowerDeliveryNotApplied | SQ-08, SQ-05 |
| CurrentDemand | The operating point, request by request | Slow answers, an output above the target, a charger that stops answering | TIM-01, TIM-05, TIM-06, SQ-09 |
| PowerDelivery Stop | The end of energy transfer | Current still flowing afterwards | PW-03, with a current log |
| WeldingDetection | Whether the car's contactors really opened | A voltage that does not fall | The session does not end cleanly |
| SessionStop | The end of the session, or a pause | A connection closed before the response | TC-02 |
SQ-01 checks the order of the whole sequence against the state machine of the protocol that was negotiated. A step back is allowed where the standard allows it, for example a new ChargeParameterDiscovery after the charger asked for renegotiation. How the car's limits and the charger's limits combine is explained in How the car sets its limits.
DIN SPEC 70121 differences
| Step | ISO 15118-2 | DIN SPEC 70121 |
|---|---|---|
| Payment selection | PaymentServiceSelectionReq | ServicePaymentSelectionReq |
| Authorization | AuthorizationReq | ContractAuthenticationReq |
| Payment in practice | ExternalPayment, or Contract (Plug and Charge over TLS) | ExternalPayment only, normally without TLS |
| Requested energy transfer | RequestedEnergyTransferMode | EVRequestedEnergyTransferType |
| Start and stop | ChargeProgress Start, Stop or Renegotiate | ReadyToChargeState true or false |
| EVSEProcessing | Finished, Ongoing, Ongoing_WaitingForCustomerInteraction | Finished, Ongoing |
| Isolation status | Invalid, Valid, Warning, Fault, No_IMD | Invalid, Valid, Warning, Fault |
| SessionStopReq | ChargingSession Terminate or Pause | No fields |
| Meter in CurrentDemandRes | Optional MeterInfo and ReceiptRequired | Not part of the message |
The electrical steps are the same in both, and IEC 61851-23 governs them. Most cars that offer both list them in the app handshake with different priorities, and many chargers in the field still pick DIN SPEC 70121.
Timing along the way
- Each answer within V2G_EVCC_Msg_Timeout: 2 s for most messages, 5 s for PowerDelivery, 0.25 s for CurrentDemand in the profile (TIM-01).
- Authorization and ChargeParameterDiscovery may stay Ongoing for up to V2G_EVCC_Ongoing_Timeout, 60 s in the profile (TIM-02). CableCheck has its own timer, which is not in the profile.
- PreCharge has to reach the target within dc.prechargeTimeoutS, 7 s, and within dc.prechargeToleranceV, 20 V (DC-01).
- From the first SDP request to SessionSetupRes within 20 s (TIM-04); between a response and the next request at most 60 s (TIM-03).
All of these values are flagged for verification in the limit profile. Every timer and timeout lists them with their sources, and Limit profiles: the numbers behind every check explains how to change them for a test plan.
Sources
- ISO 15118-2:2014, DC message set and sequence, timing tables
- DIN SPEC 70121:2014-12, DC message set and sequence
- IEC 61851-23, the electrical sequence of a DC charging station
- ChargeX Consortium: ev-charge-seq-state, Argonne National Laboratory, Apache-2.0: PlantUML sequence diagrams of SAE J1772, ISO 15118-2 and ISO 15118-20 with OCPP 1.6J, 2.0.1 and 2.1, including an ISO 15118-20 DC session with cable check, pre-charge and welding detection