How EV charging is tested
The kinds of testing a car, a charger and a backend go through: communication conformance, protocol certification, safety and type testing, EMC, interoperability events, OCPP certification, metrology, cybersecurity and field reliability, and who does each.
Many tests, different questions
A charger that reaches the market has been tested many times, and each test answers a different question. Is it safe to touch and to install? Does it disturb the radio spectrum? Does it speak the protocol as the standard writes it? Does it work with the cars that will plug into it? Does its backend understand it? Is the energy it bills measured correctly? Can an attacker take it over? And, after it is installed, does it keep working?
- Conformance testing checks one product against a standard. A test system plays the other side and provokes the reactions the standard requires.
- Certification adds a body that checks the process and issues a certificate, a listing or a type-examination certificate.
- Interoperability testing puts real products together. It finds what conformance misses: two readings of the same clause, timing that is legal on both sides but does not fit.
- Field monitoring measures what drivers experience: sessions that start, sessions that finish, and the errors in between.
Test levels at a glance
| Level | What is tested | By whom | Standard or program | Result |
|---|---|---|---|---|
| CCS communication conformance, first generation | EVCC or SECC against ISO 15118-2 and -3, or against DIN SPEC 70121 | Test labs and manufacturers, with a conformance test system | ISO 15118-4 (layer 3 and up), ISO 15118-5 (layers 1 and 2), DIN SPEC 70122 | Test report against the PICS of the product |
| CCS communication conformance, ISO 15118-20 | EVCC or SECC against ISO 15118-20 | Test labs and manufacturers | ISO 15118-21:2025 (common), ISO/PAS 15118-23:2026 (DC), ISO 15118-22 (security, a work item) | Test report |
| CHAdeMO certification | Charger against the CHAdeMO specification | Certification bodies registered by the CHAdeMO Association | CHAdeMO certification scheme | Certification of the charger |
| GB/T conformance and interoperability | Charger to BMS protocol; supply equipment interoperability | Test labs in China | GB/T 34658, GB/T 34657.1 | Test report |
| Safety and type testing | Protection against shock, fire and faults; the charging functions of the Control Pilot | Accredited labs and certification bodies (NRTLs in North America) | IEC 61851-1, IEC 61851-23; UL 2594 (AC), UL 2202 (DC) | Type test report, certification or listing |
| EMC | Emissions and immunity of the charger, and of the car while charging | EMC labs | IEC 61851-21-2 (off-board), IEC 61851-21-1 (on-board) | Test report |
| Interoperability events | Real cars against real chargers | Manufacturers together, hosted by associations and national labs | CharIN Testivals; ChargeX EV-EVSE Interoperability Test Plan | Findings per pairing, no certificate |
| Backend protocol | Charging station or CSMS against OCPP | Labs authorised by the Open Charge Alliance, with OCTT | OCPP 1.6 and 2.0.1 certification | OCA certificate naming the certification profiles |
| Metrology | Energy measurement and the data used for billing | National metrology institutes, notified bodies, weights and measures authorities | Eichrecht (Germany), MID (EU), NIST Handbook 44 section 3.40 (US) | Type-examination certificate, type evaluation |
| Cybersecurity | Network security, data protection, fraud resistance of the charger | Notified bodies and test labs; the manufacturer for self assessment | EU RED delegated regulation 2022/30 with EN 18031; UK Smart Charge Points Regulations 2021 | Assessment report, declaration of conformity |
| Field reliability | Sessions in daily use | Operators, programs that fund charging, national labs | ChargeX KPIs and Minimum Required Error Codes; funding program rules | Uptime and success figures |
Communication conformance
For the first generation of ISO 15118, two parts carry the tests. ISO 15118-4:2018 specifies an abstract test suite for an EVCC or SECC that implements ISO 15118-2, written in TTCN-3 for the network layer and above. ISO 15118-5:2018 does the same for the physical and data link layers of ISO 15118-3, including basic signalling. Both split their tests into capability tests (does the product have what it claims) and behaviour tests (does it act as required over the range of its capabilities).
For ISO 15118-20, the tests are split by topic. ISO 15118-21, published in 2025, covers the requirements common to all energy transfer types and describes its test cases in tables for layers 3 to 7. ISO/PAS 15118-23, approved in April 2026, adds the DC specific requirements on the same test architecture. ISO 15118-22 on security (Plug and Charge, XML signatures, TLS error cases) is an approved work item, and a new edition of part 21 is registered as a work item too (ISO catalogue, September 2026).
DIN SPEC 70122:2018 is the conformance test for DIN SPEC 70121. It covers SLAC, SDP, V2GTP, the protocol handshake and the messages of setup, charging loop and termination.
CHAdeMO runs its own certification. A charger maker must be a regular member of the CHAdeMO Association, hands its documentation to one of the registered certification bodies and has the protocol tested there. In China, GB/T 34658 is the conformance test for the charger to BMS protocol of GB/T 27930, and GB/T 34657.1 the interoperability test for supply equipment; both got 2025 editions that apply from 1 March 2026. Commercial test systems implement it: Keysight, for example, announced test case software for GB/T 34657.1. Part 2, GB/T 34657.2-2017, is the interoperability test for the vehicle side, and test system makers such as Keysight and ITECH offer test software for it too.
Which bodies CHAdeMO lists today, and whether GB/T 34657.2 has a newer edition than 2017, were not confirmed from a primary page for this article. Check them with the CHAdeMO Association and the SAC catalogue.
Safety, EMC, metrology and security
- Safety and function: IEC 61851-1 sets the general rules of conductive charging, including the Control Pilot, and IEC 61851-23 adds the DC charging station. In North America, UL 2594 covers AC supply equipment up to 1 000 V AC (cord sets, wall boxes, fixed stations) and UL 2202 covers off-board DC chargers. More in Safety and type approval of chargers and cars.
- EMC: IEC 61851-21-2:2018 covers off-board equipment for modes 1 to 4. IEC 61851-21-1:2017 covers the on-board charger, tested on the complete vehicle or as a component. Both editions now contain only EMC tests; earlier editions mixed in other electrical tests.
- Metrology: in Germany, a charger that bills by energy needs a Module B type-examination certificate as the first step under the calibration law. In the EU, meters fall under the Measuring Instruments Directive, and a 2025 proposal adds an annex for EVSE measuring systems. In the US, NIST Handbook 44 section 3.40 applies where energy is sold by measurement, and NTEP accepts a charger for type evaluation only after safety certification by an NRTL. More in Billing and measurement testing.
- Cybersecurity: since 1 August 2025, radio equipment placed on the EU market, chargers with a radio included, must meet the cybersecurity requirements added to the Radio Equipment Directive, assessed against EN 18031. In Great Britain, the Smart Charge Points Regulations 2021 set security requirements for smart charge points from 30 December 2022. More in Security testing of chargers.
Interoperability, backend and the field
CharIN Testivals bring cars and chargers together for days of pairings; see Interoperability test events. In the US, the ChargeX Consortium (national labs with industry, June 2023 to September 2025) wrote the EV-EVSE Interoperability Test Plan. Version 2.0 of July 2025 sorts its cases into baseline functionality and safety tests (authentication methods and timeouts, protocol priority selection, idle faults, session initialization, power transfer) and advanced tests (two cars on one dispenser, seamless retry). At the June 2024 Testival, ChargeX ran eight of these scenarios in the last 30 minutes of each 90 minute slot.
For the backend, the Open Charge Alliance certifies OCPP implementations. The device runs the conformance tests of the OCPP Compliance Testing Tool (OCTT) at an authorised lab; for OCPP 2.0.1 these are DEKRA, DNV and the Korea Smart Grid Association. The certificate names the certification profiles passed. See OCPP certification and Backend, Plug and Charge and payment test cases.
In the field, ChargeX published 26 Minimum Required Error Codes, prefixed CX, that were later codified in SAE J2953/3, and a calculator for interim reliability KPIs from OCPP 2.0.1 logs. See Reliability of public charging: what field data says.
Who does what
| Party | Role in testing |
|---|---|
| Manufacturer | Develops against the standard, runs its own test plan and a pre-test, writes the PICS and PIXIT, signs the declaration of conformity |
| Test lab | Runs the test suite on the product with its own test system and writes the report |
| Certification body | Issues the certificate or listing: OCA for OCPP, the registered bodies for CHAdeMO, NRTLs for UL standards, notified bodies for EU directives, PTB for Eichrecht |
| Protocol owner | Writes the test specification or the tool and authorises the labs (OCA, CHAdeMO Association, CharIN) |
| Operator | Tests a product before buying it, accepts each site, monitors sessions and faults |
| Regulator or funder | Makes some of the above mandatory, and sets uptime rules for funded chargers |
Reading on
- Anatomy of a test case: how a test case is written, with PICS, PIXIT and verdicts.
- AC test cases, worked, DC test cases, worked and Backend, Plug and Charge and payment test cases: worked test cases.
- Conformance testing: ISO 15118-4, -5 and Testivals: the ISO 15118 conformance parts in more depth.
- Test equipment for charging: the test systems, sniffers and loads a lab uses.
In this tool
The analyzer is passive: it judges a capture of two real products, and does not play either side. That makes it useful beside every test level above. It explains a failed conformance run if the test system exports a capture, it keeps the evidence of each pairing at an interoperability event, and its command line runner (v2g-analyze --junit) turns a folder of lab captures into a test report for a regression run. A pass here is not a certificate: an option that was not used or a fault that did not happen is not seen. See Session end verdicts.
Sources
- ISO 15118-4:2018, network and application protocol conformance test, catalogue abstract: abstract test suite in TTCN-3 for an EVCC or SECC implementing ISO 15118-2, layer 3 and above
- ISO 15118-5:2018, physical layer and data link layer conformance test, catalogue abstract: layers 1 and 2 for PLC based HLC and basic signalling per ISO 15118-3; confirmed in 2023
- ISO 15118-21:2025, common second generation conformance test plan, catalogue abstract: requirements of ISO 15118-20 common to AC, DC, ACD and WPT; descriptive tables, layers 3 to 7
- ISO/PAS 15118-23:2026, second generation conformance test plan for DC charging, catalogue abstract: DC specific requirements of ISO 15118-20; test architecture inherited from ISO 15118-21
- ISO/AWI 15118-22, second generation protocol security requirements conformance test plan, approved work item: simulated SECC, EVCC and PKI; Plug and Charge, XML signature, end to end security; test case attributes
- ISO/AWI 15118-21, approved work item for a new edition of the common conformance test plan
- DIN SPEC 70122:2018, conformance tests for the DC communication of DIN SPEC 70121: SLAC, SDP, V2GTP, handshake, setup, loop, termination
- CHAdeMO Association: certification, third party certification of chargers, membership required, registered certification bodies, steps of the process
- GB/T 34657.1, interoperability test specifications of EV conductive charging, part 1: supply equipment, 2017 edition and 2025 edition, the latter in force from 1 March 2026 (catalogue listing)
- Keysight: SL1310A GB/T 34657-2 EV, release notes, test software for GB/T 34657.2, the interoperability test of the vehicle
- ITECH: GB/T 34657.2-2017 vehicle interoperability test solution, GB/T 34657.2-2017, part 2: vehicle
- GB/T 34658, conformance test for communication protocols between off-board conductive charger and BMS, 2017 edition and 2025 edition, the latter in force from 1 March 2026 (catalogue listing)
- Keysight press release: Scienlab SL1302A test case software, interoperability tests based on GB/T 34657.1
- IEC 61851-21-1:2017, EMC of on-board charging units, tested on the vehicle or as a component; a second edition is in preparation
- IEC 61851-21-2:2018, EMC of off-board charging equipment for modes 1 to 4, up to 1 000 V AC or 1 500 V DC
- UL 2594, Electric Vehicle Supply Equipment, scope: AC EVSE up to 1 000 V AC feeding an on-board charger (cord sets, stations, power outlets)
- Intertek: UL 2202 testing, scope of UL 2202: off-board DC charging equipment up to 1 000 V AC or 1 500 V DC input
- Open Charge Alliance: certification program, conformance tests with OCTT run by independent test laboratories the OCA authorises
- Open Charge Alliance: OCPP 2.0.1 certification, Core profile mandatory; Advanced Security, Smart Charging, ISO 15118 Support and Local Authorization List Management optional; labs DEKRA, DNV, KSGA
- Open Charge Alliance: OCPP Compliance Test Tool (OCTT), cloud tool since October 2022 for charging stations, CSMS and charging station software stacks, OCPP 1.6 and 2.0.1
- NIST Handbook 44, section 3.40 Electric Vehicle Fueling Systems (2026 edition), applies where energy is sold by measurement; NTEP type evaluation only after NRTL safety certification; permanent code from 1 January 2023
- XCHARGE press release on a Module B type-examination certificate for a DC charger, Module B as the first step of conformity with the German calibration law (Eichrecht), issued by PTB
- Council of the EU working document WK 6097/2025, proposal to amend the Measuring Instruments Directive 2014/32/EU: update of Annex V (MI-003) and a new Annex Va for EVSE measuring systems
- Easee: EU cybersecurity compliance, September 2025, RED delegated regulation (EU) 2022/30 applies from 1 August 2025; assessment against EN 18031 confirmed by DEKRA
- UK government: regulations for EV smart charge points, Electric Vehicles (Smart Charge Points) Regulations 2021; security requirements of Schedule 1 from 30 December 2022
- ChargeX EV-EVSE Interoperability Test Plan (EEITP), version 2.0, July 2025, Argonne, Idaho and NREL researchers of the ChargeX testing task force; test tree with baseline, safety and advanced tests
- ChargeX Consortium: overview and accomplishments, 30 September 2025, June 2023 to September 2025; MRECs codified in SAE J2953/3; Remote Test Harness; EEITP 1 and 2; prescribed testing at CharIN Testivals
- ChargeX Minimum Required Error Codes, 26 charger error codes with the prefix CX
- ChargeX Consortium on GitHub, OCPP 2.0.1 interim KPI calculator, Open Remote Test Harness, sequence and state machine models