Grid code testing of bidirectional chargers

A charger that feeds energy back is a generator to the grid. Which interconnection rules apply in North America (IEEE 1547, IEEE 1547.1, UL 1741 SB and SC, SAE J3072) and in Europe (EN 50549, VDE-AR-N 4105), and what the tests cover: anti-islanding, ride-through, volt-VAR and the other grid support functions.

Why a charger becomes a generator

When a car discharges into a house or the grid, the inverter that makes the AC behaves like a solar or battery inverter, and the grid operator asks the same of it. Where that inverter sits decides who is tested:

  • DC bidirectional charging: the inverter is in the charger. The charger is certified as the generating unit.
  • AC bidirectional charging: the inverter is the onboard charger of the car. The car carries the grid functions, and the charger supervises the connection. In North America SAE J3072 covers the onboard inverter.

The charging communication that negotiates discharge is covered in ISO 15118-20: control modes, BPT and power profiles and Bidirectional power transfer in ISO 15118-20, message by message; the use cases are in Bidirectional charging: V2G, V2H, V2L and Bidirectional charging: V2H, V2B, V2G and V2L in practice.

North America

DocumentWhat it is
IEEE 1547-2018 (amended by IEEE 1547a-2020)The requirements for connecting distributed energy resources to the distribution grid
IEEE 1547.1-2020The test procedures that show conformance to IEEE 1547
UL 1741, supplement SBThe certification of inverters and other interconnection equipment, running the grid support tests the way IEEE 1547.1 specifies
UL 1741, supplement SCPublished 21 May 2026: AC bidirectional EVSE and interconnection equipment for cars with an SAE J3072 onboard inverter, so a charger can be certified without pairing it with one car model
UL 9741Electric vehicle power export equipment; with the UL 1741 multipiece route, the earlier path that certified a charger together with a specific car
SAE J3072Interconnection requirements for the onboard inverter of an AC bidirectional car

Utilities decide which of these they require; California Rule 21 and similar tariffs name them.

What the tests cover

FunctionWhat is testedIEEE 1547-2018
Anti-islandingWhen the grid section is cut off, the unit detects the island and stops energising it; the test loads the island so that generation and load balanceClause 8.1: detect, cease to energise and trip within 2 s of the island forming
Voltage and frequency ride-throughThe unit stays connected, or stops and returns, through dips and swells as its category allowsClause 6, abnormal performance categories I, II and III
Reactive power and voltage controlConstant power factor, volt-VAR, watt-VAR, constant reactive power and volt-wattClause 5, normal performance categories A and B
Frequency responseActive power reduced or raised with frequency (frequency-droop)Clause 6
Enter serviceWaiting for voltage and frequency to settle before connecting, and ramping upClause 4
InteroperabilityA communication interface to change settings and read values, for example IEEE 2030.5, IEEE 1815 (DNP3) or SunSpec ModbusClause 10

Only the 2 s limit of clause 8.1 was confirmed from a quoted source. The other clause numbers and the list of functions per clause are from the structure of IEEE 1547-2018 as commonly summarised; check them in the standard.

Europe

  • The EU network code Requirements for Generators (Regulation (EU) 2016/631) sets the frame; European standards and national rules fill it in.
  • EN 50549-1:2019 covers generating plants connected to low voltage networks, EN 50549-2:2019 medium voltage. Amendment A1:2023 of part 1 treats a charging station that can feed back as an electrical energy storage system while a car is connected.
  • EN 50549-10:2022 gives the tests that show conformity of generating units and interface protection to parts 1 and 2; a revision (prEN 50549-10:2026) is in draft.
  • Germany: VDE-AR-N 4105 is the application rule for generators on the low voltage grid, and a bidirectional wallbox that feeds into the house falls under it. VDE FNN published guidance in January 2025 on how to prove compliance with VDE-AR-N 4105 for bidirectional charging, for DC and AC connections.

Other national rules (for example the UK engineering recommendations G98 and G99, or the Austrian TOR Erzeuger) and the revision of the EU network code were not researched for this page.

How the tests are run

  • A grid simulator plays the grid, so voltage and frequency can be stepped, ramped and distorted; a battery emulator or DC source plays the car on a DC charger (Test equipment for charging).
  • Anti-islanding tests add a resonant load (resistance, inductance and capacitance) tuned so that the island does not collapse on its own.
  • Each function is tested at its settings and at the limits of its category, and the unit is certified with a set of settings the utility may then adjust.
  • For AC bidirectional charging, the car proves the grid functions (SAE J3072) and the charger proves its part as the supervisor of the connection (UL 1741 SC), so neither has to be certified as a pair with one model of the other.

Grid code tests are separate from the charger safety and communication tests in Safety and type approval of chargers and cars and Conformance testing: ISO 15118-4, -5 and Testivals; a bidirectional product needs all three.