Workplace and destination charging
Many AC charge points behind one grid connection at an office, a hotel or a car park: dynamic load management, access control with cards or the car, billing of employees and guests, the building and grant rules in Europe, the UK and the US, and the failures that load management brings out.
The setting
Employees park for a working day, guests of a hotel overnight, shoppers for an hour or two. The charge points are mostly AC, often many of them, and they share one grid connection that was sized for the building. Involved are the site owner or employer, a charge point operator (in house or contracted), the facility manager, the drivers, and, for billing, payroll or a mobility service provider. A few DC chargers may sit beside them for fleet cars or quick top ups.
Rules and grants
| Region | Rule or program | Content |
|---|---|---|
| European Union (Europe: AFIR, Type 2, CCS2 and ISO 15118) | Directive (EU) 2024/1275, Article 14 | All non-residential buildings with more than 20 car parking spaces must have, by 1 January 2027, at least one recharging point for every 10 spaces or ducting for at least half of the spaces. New and renovated buildings have further requirements, and recharging points must be capable of smart charging. |
| Great Britain (United Kingdom: smart charge points, the Public Charge Point Regulations and Type 2 with CCS2) | Workplace Charging Scheme; Smart Charge Points Regulations 2021 | The grant covers up to 75 percent of the cost, capped at 350 GBP per socket for installations completed before 1 April 2026 and 500 GBP after, for up to 40 sockets; it runs until 31 March 2027 and needs an OZEV authorised installer and an approved model. Private workplace charge points fall under the smart charge point regulations like home chargers. |
| Germany (Europe: AFIR, Type 2, CCS2 and ISO 15118) | Section 3 no. 46 EStG | Charging an employee car at the employer is tax free until 31 December 2030 when it comes on top of the salary; a charger lent to the employee can be taxed at a flat 25 percent. Electricity for a company car charged at home can be reimbursed tax free as an expense (BMF letter of 11 November 2025, as summarised by Haufe). |
| United States (North America: J1772, CCS1, J3400 and the NEVI standards) | Section 30C credit | For business property, 6 percent of the cost (30 percent when prevailing wage and apprenticeship rules are met), up to 100,000 USD per item, in eligible census tracts; not for property placed in service after 30 June 2026. |
Load management and access
- Static load management divides a fixed budget among the charge points. Dynamic load management measures the building load and gives the chargers what is left. gridX states that its dynamic load management allowed up to five times more charge points on the same connection at a customer site.
- The limits reach the charger either from a local controller or from the backend through OCPP. OCPP 2.0.1 knows four profile purposes:
ChargingStationExternalConstraints,ChargingStationMaxProfilefor the whole station,TxDefaultProfilefor every transaction andTxProfilefor one. The charger turns the result into a duty cycle (Smart charging: schedules, limits and grid signals). - Access control is usually an RFID card checked against a local list or the backend (OCPP Authorize). The driver sees a charger that does nothing when the card is unknown or the backend is slow.
- Billing separates private and business use. Employee charging is billed through payroll or a mobility contract; guest charging through an ad hoc payment or a roaming contract (Payment, roaming and Plug and Charge). Where the kilowatt hours are billed, the meter and its legal rules matter (Energy metering and signed meter values).
What fails
- Cars that do not resume after a pause. Load management lowers chargers to 0 A when many cars arrive at once. The Nature Communications study of June 2024 found paused or delayed charging problems in around one third of the car models tested; they fall asleep and stay idle. The ElaadNL smart charging requirements ask that charging resumes after a pause of any length, and advise keeping cars at their minimum current instead of pausing them.
- Mechanisms worth testing, for which no field statistics are given here: a car that follows a lower duty cycle too slowly, so the building fuse sees the peak anyway; cards accepted too slowly because the backend is offline or answers late, while an ISO 15118 car waits in the authorization loop until it gives up; and a load manager that does not know how many phases a car uses and gives a single phase car a three phase share it cannot use.
ElaadNL tested this behaviour at scale: its test program, published on 30 September 2025, covered 142 vehicles (114 battery electric and 28 plug in hybrids) and 10 charge points over 11 months. ElaadNL reports that a majority of the vehicles passed and that cars and chargers behaved as expected in normal smart charging. Its intermittent charging test switches the charging signal 25 times between 0 and 6 A at 60 second intervals.
What to record and test
- On one charge point, the Control Pilot log with the phase currents, the network capture if the car speaks ISO 15118, and the OCPP log of the same charger with its SetChargingProfile and TransactionEvent or StartTransaction frames.
- At the site, the grid connection current next to the sum of the charge point currents, to see whether load management keeps the limit.
- Tests: a pause and resume at 0 A, a stepped duty cycle, ten cars starting at the same time, a card unknown to the backend, a backend that is offline, and the resume after a charger reboot. AC test cases, worked and Backend, Plug and Charge and payment test cases have test case forms for them.
In this tool
- The ac-ok demo shows an AC session with its Control Pilot and OCPP logs on one timeline; the ocpp-rejected demo a card that the backend answers Invalid while the charger keeps the car at Ongoing (Worked example: the backend rejects the card).
- CP-03 checks that every duty cycle is an allowed value; PW-01 that the car follows the permitted current after
pw.settlingTimeS; PW-05 that current flows while the energy loop runs. TIM-02 times the authorization loop. - The OCPP tab lists the connector status, the transactions with their metered energy, the backend errors and slowest answer, and compares the backend view with the cable. OCPP frames such as SetChargingProfile appear on the timeline and in the table; the tool does not evaluate the profiles and OCPP never changes a check or the verdict.
- Batch mode reads many files at once and shows, per charger (EVSEID or modem) and per car (EVCCID or MAC), the share of sessions that completed and the most common problem: the quickest way to find the one car model that does not resume.
Sources
- Directive (EU) 2024/1275 on the energy performance of buildings (recast), Article 14, infrastructure for sustainable mobility
- Interreg Danube: EU directive on the energy performance of buildings, existing non-residential buildings with more than 20 spaces by 1 January 2027
- UK Government: Workplace Charging Scheme, up to 350 GBP per socket, 500 GBP from 1 April 2026, up to 40 sockets, 75 percent of costs, until 31 March 2027
- GOV.UK: Workplace Charging Scheme, guidance for installers, OZEV authorised installers and approved chargepoint models
- OZEV: Guide to the Electric Vehicles (Smart Charge Points) Regulations 2021, version 2.1, scope: private domestic and workplace charge points; public and rapid charge points excluded
- Haufe: Elektrofahrzeuge, Aufladen im Betrieb und zuhause, section 3 no. 46 EStG until 31 December 2030; 25 percent flat tax under section 40 (2); BMF letter of 11 November 2025
- IRS: Instructions for Form 8911 (12/2025), section 30C credit; termination moved to 30 June 2026 by P.L. 119-21
- gridX: dynamic load management at Axel Springer, press release; up to five times more charge points on the same connection, as the vendor states
- Brinkel, van Wijk, van Sark et al.: Enhancing smart charging in electric vehicles by addressing paused and delayed charging problems, Nature Communications, 25 June 2024
- ElaadNL / Nationale Agenda Laadinfrastructuur: Smart Charging Requirements, resuming after an indefinite pause; intermittent charging test
- ElaadNL: Results of large scale technical smart charging test of electric vehicles, 30 September 2025; 142 vehicles and 10 charge points over 11 months
- OCPP 2.0.1: ChargingProfilePurposeEnumType, ChargingStationExternalConstraints, ChargingStationMaxProfile, TxDefaultProfile, TxProfile