United Kingdom: smart charge points, the Public Charge Point Regulations and Type 2 with CCS2
How charging is regulated in Great Britain and the United Kingdom after leaving the EU: Type 2 and Combo 2 from the 2017 regulations, the smart functions and default off peak schedule of the Smart Charge Points Regulations 2021, the reliability, contactless, pricing, helpline and open data duties of the Public Charge Point Regulations 2023, the OZEV grants and the official charger count.
Connectors and the 2017 regulations
The United Kingdom uses the European connectors. The Alternative Fuels Infrastructure Regulations 2017 (SI 2017/897), worded like the EU directive of 2014 described in Europe: AFIR, Type 2, CCS2 and ISO 15118, require that publicly accessible AC points carry at least a Type 2 socket or connector (EN 62196-2), and that public DC high power points carry at least a Combo 2 connector (EN 62196-3) or one with the same or higher performance. Public points deployed or renewed after the regulations were made must also let a driver charge ad hoc, without a contract with the operator.
After Brexit the EU regulation AFIR (see Europe: AFIR, Type 2, CCS2 and ISO 15118) does not apply in Great Britain. The UK set its own rules for home and workplace chargers in 2021 and for public chargers in 2023, described below.
No UK rule found in this review makes ISO 15118 or a backend protocol such as OCPP mandatory for public charge points. The open data duty names OCPI (see below). Check the current guidance before assuming either way.
Smart charge points at home and at work
The Electric Vehicles (Smart Charge Points) Regulations 2021 (SI 2021/1467) apply to charge points sold in Great Britain for private use, at home or at work. They came into force on 30 June 2022; the security requirements of Schedule 1 followed on 30 December 2022. The Office for Product Safety and Standards (OPSS) enforces them.
- Scope: charge points for cars and vans. Public charge points, rapid charge points of 50 kW or more and cables without smart functions are excluded, and so are charge points sold before 30 June 2022.
- Smart functions: the charge point can send and receive information, respond to signals that raise or lower the rate or shift the time of charging, take part in demand side response, and offers a user interface.
- Default schedule: a new charge point comes preset to charge outside the peak hours of the day, which the regulations set at 8:00 to 11:00 and 16:00 to 22:00 on weekdays (Monday to Friday), as operator guides from bp pulse and Easee also give them. The owner can change or override it.
- Randomised delay: the charge point must be able to delay the start or end of charging by a random time of up to 1800 seconds, chosen to the nearest second each time, so that many chargers do not switch at the same moment.
- Security: Schedule 1 sets the security requirements, from 30 December 2022.
The Public Charge Point Regulations 2023
The Public Charge Point Regulations 2023 (SI 2023/1168) came into force on 24 November 2023 and apply across the United Kingdom. Most duties started one year later. The government guidance was first published on 24 November 2023 and updated on 21 October 2024.
| Duty | Which points | From |
|---|---|---|
| Contactless payment | New public points of 8 kW or more; existing public points of 50 kW or more | 24 November 2024 |
| Roaming payment service | Public points | Within two years, so by 24 November 2025 |
| Price in pence per kWh, the total cost of a session including any connection fee shown, and not raised once charging has started | Public points | 24 November 2023, when the regulations came into force |
| Free 24/7 staffed telephone helpline, advertised at every charge point | Public points | 24 November 2024 |
| Open data: reference and availability data held for every point and published in a machine readable form, using OCPI | Public points | Within one year, so by 24 November 2024 |
| 99 percent reliability, measured as the average over the rapid network of each operator in a calendar year, and published on the website of the operator | Rapid points (50 kW or more) | Data collection from 24 November 2024; first full year 2025; reports from January 2026 |
Operators that fail these duties face civil penalties of up to £10,000, according to summaries of the regulations. For a capture, the contactless duty means that authorization often happens at a card terminal and in the backend, not over ISO 15118: Payment, roaming and Plug and Charge follows such a payment through car, charger and backend.
The exact definition of reliability (which downtime is excluded) and the size of the penalties for each duty are taken from law firm and operator summaries of the regulations and the gov.uk guidance, not from the text itself. The OCPI version is not confirmed.
Grants and funds
- OZEV chargepoint grants: the Office for Zero Emission Vehicles extended its home and workplace chargepoint grants to 31 March 2027. From 1 April 2026 the grant for renters and flat owners rose from £350 to up to £500 towards a home charge point.
- Workplace Charging Scheme: up to £500 per socket and up to 40 sockets across all sites, for businesses, charities and public sector bodies, open to March 2027.
- Local Electric Vehicle Infrastructure (LEVI) Fund: about £381 million (£343 million capital and £37.8 million capability funding) for local authorities in England, mostly for lower power on street charging.
- Rapid Charging Fund: the £950 million fund for rapid charging at motorway services was scrapped in July 2025. Trade press reported that it is partly replaced by a £400 million investment from the Spending Review, aimed at on street charging.
According to the gov.uk page on the changes from 1 April 2026, the staff and fleets grant, the commercial landlord chargepoint grant and the residential landlord infrastructure grant (up to £30,000) closed to new applications on 31 March 2026; installers had until 26 May 2026 to submit final claims. Five schemes were extended to 31 March 2027 with new grant rates, among them the grant for flat owners and renters, the residential landlord chargepoint grant (both up to £500 per socket) and the Workplace Charging Scheme.
How many chargers
The Department for Transport (DfT) publishes a quarterly count, built from operator data that Zapmap collates. On 1 July 2026 the United Kingdom had 121,171 public EV chargers, 174.9 per 100,000 people. 28,887 of them were rated rapid or above (50 kW or more), 41.7 per 100,000 people. Since 1 January 2026 the series counts EV chargers (EVSE) instead of charging devices, so older figures are not directly comparable.
How reliable the network is in the field, and how the 99 percent rule compares with what drivers see, is the subject of Reliability of public charging: what field data says.
Safety, metering and testing
A charge point that bills by energy needs a meter approved for trade. BEAMA, the UK trade body for electrical equipment, advises manufacturers to fit meters that meet the UK Measuring Instruments Regulations (MIR) or the EU Measuring Instruments Directive (MID), and a Class B or Class C meter when the charge point bills customers. Billing and measurement testing explains how such a meter and the charger around it are examined.
This review found no UK scheme for DC metering comparable to the German Eichrecht, and did not check the UK conformity marking (UKCA) or the wiring rules for charge point installations against primary sources. See Safety and type approval of chargers and cars for the safety tests a charger passes in general.
In this tool
- UK chargers speak the same protocols as European ones. The analyzer reads DIN SPEC 70121, ISO 15118-2 and ISO 15118-20 captures, and HS-01 to HS-03 show which protocol the car offered and the charger picked.
- An EVSEID starting with GB keeps the default limit profile (IEC 61851-1 and ISO 15118-2, 230 V); see Limit profiles: the numbers behind every check.
- PP-01 checks that the proximity pin of a Type 2 cable names a valid cable class, and the PW checks follow the current against the limits the charger sets.
- The OCPP tool reads an OCPP 1.6 or 2.0.1 log next to the capture, which is where a contactless or roaming authorization shows up. The ocpp-rejected demo shows a refused card.
The analyzer checks what happens on the wire. It does not test whether a charger meets the Smart Charge Points or Public Charge Point Regulations.
Summary and further reading
| Aspect | United Kingdom |
|---|---|
| AC connector | Type 2 (EN 62196-2) |
| DC connectors | Combo 2, also called CCS2 (EN 62196-3) |
| Car to charger communication | PLC on the Control Pilot: DIN SPEC 70121: DC charging, the early CCS protocol, ISO 15118-2: the first generation application layer, ISO 15118-20: the second generation; no national mandate found |
| Backend | OCPI for open data under the 2023 regulations; OCPP: the charger's link to its backend common but not found as a legal duty |
| Key rules | Alternative Fuels Infrastructure Regulations 2017; Smart Charge Points Regulations 2021 (30 June 2022, security 30 December 2022); Public Charge Point Regulations 2023 (24 November 2023, most duties 24 November 2024) |
| Test and certification | OPSS enforces the smart charge point rules; meters to MIR or MID; see Billing and measurement testing, Safety and type approval of chargers and cars and How EV charging is tested |
Read on: Charging around the world for the other markets, Europe: AFIR, Type 2, CCS2 and ISO 15118 for AFIR, Highway and urban fast charging hubs and Payment, roaming and Plug and Charge for rapid charging and payment, OCPP: the charger's link to its backend for the backend, and MCS: the Megawatt Charging System for trucks.
Sources
- The Alternative Fuels Infrastructure Regulations 2017 (SI 2017/897), Type 2 and Combo 2 for public points; ad hoc charging
- The Electric Vehicles (Smart Charge Points) Regulations 2021 (SI 2021/1467), regulation 3 (scope and exclusions); Part 2 (requirements); Schedule 1 (security)
- The Electric Vehicles (Smart Charge Points) Regulations 2021, Part 2, randomised delay of up to 1800 seconds
- GOV.UK: Regulations, electric vehicle smart charge points, guidance for sellers; OPSS as enforcement authority
- BSI: Smart EV charging regulations explained, in force 30 June 2022, security from 30 December 2022, default off peak schedule
- Pod Point: The Electric Vehicles (Smart Charge Points) Regulations and what they mean
- bp pulse: Smart charge regulations, peak hours 8am to 11am and 4pm to 10pm, Monday to Friday
- Easee: Off-peak charging (UK), default charging hours outside 8am to 11am and 4pm to 10pm on weekdays
- The Public Charge Point Regulations 2023 (SI 2023/1168), in force 24 November 2023; contactless and open data within one year, roaming within two years
- GOV.UK: Public Charge Point Regulations 2023 guidance, published 24 November 2023, updated 21 October 2024
- Fleet News: Guidance clarified ahead of new charge point rules coming into force, price transparency in pence per kWh from 24 November 2023
- Zemo Partnership: Public Chargepoint Regulations to improve consumer experience of EV charging come into effect
- AMPECO: UK Public Charge Point Regulations, contactless at 8 kW and 50 kW, 99 percent reliability, pence per kWh, helpline, OCPI
- Foot Anstey: New Public Charge Point Regulations in force from 24 November 2024
- Tap Electric: UK Public Charge Point Regulations for 2025, reliability data from 24 November 2024, first full year 2025, reports from January 2026
- DfT: Public electric vehicle charging infrastructure statistics, 1 July 2026, 121,171 public chargers, 28,887 rated 50 kW or more
- GOV.UK: Electric vehicle chargepoint grants
- GOV.UK: Changes to electric vehicle chargepoint grant schemes from 1 April 2026, staff and fleets, commercial landlord and residential landlord infrastructure grants closed 31 March 2026; five schemes extended to 31 March 2027
- Zaptec: UK EV chargepoint grants, grants extended to 31 March 2027; £500 per socket from 1 April 2026
- Energy Saving Trust: £381 million Local Electric Vehicle Infrastructure fund launches
- Fleet News: Government scraps £950m rapid charging plan and readies new approach
- Logistics UK: Government scraps £950m EV rapid charging fund, 10 July 2025
- BEAMA: Guidance on the Measuring Instruments Regulations (MIR) in the UK and the Measuring Instruments Directive (MID), meters for EV charge points, Class B or C for billing