China: GB/T charging, CCC certification and the largest charging network
China runs its own national system: GB/T 20234 connectors for AC and DC, GB/T 27930 CAN communication between charger and car, GB/T 18487 for the system. The 2023 editions raise DC current while staying plug compatible, ChaoJi adds a new high power connector, and from 1 August 2026 charging equipment needs CCC certification.
At a glance
China does not use CCS or CHAdeMO. Cars and chargers follow national GB/T standards, published by the State Administration for Market Regulation (SAMR) and the Standardization Administration of China (SAC). The DC side talks over CAN, like CHAdeMO, and not over powerline like CCS. GB/T 27930: the Chinese DC protocol covers the messages, SAE J1939 on a charging bus the addressing and ChaoJi and CHAdeMO 3.0 the next generation connector.
| Aspect | China |
|---|---|
| AC connector | GB/T 20234.2 (2015 edition, confirmed as still valid in a review of 29 September 2025) |
| DC connector | GB/T 20234.3 (2015, revised 2023 as "2015+", plug compatible); GB/T 20234.4-2023 high power DC interface (ChaoJi) |
| Car to charger communication | CAN, GB/T 27930 (2015 edition, replaced by GB/T 27930-2023 from 1 April 2024) |
| System requirements | GB/T 18487.1-2023, in force from 1 April 2024, replaces the 2015 edition |
| Backend and platform exchange | T/CEC 102 (2016) for information exchange between charging service platforms; charger to backend not set by one national standard this page could confirm |
| Key safety rules | GB 39752-2024 and GB 44263-2024, mandatory, in force from 1 August 2025; CCC certification required from 1 August 2026 |
| Certification | CCC through certification bodies designated by SAMR; CQC voluntary certification before that |
| Statistics | China Charging Alliance (EVCIPA) monthly, National Energy Administration (NEA) |
The connectors: GB/T 20234 in four parts
| Part | Subject | Edition in force | Dates |
|---|---|---|---|
| GB/T 20234.1 | General requirements | 2023 | Published and in force 7 September 2023 |
| GB/T 20234.2 | AC charging coupler | 2015 | Published 28 December 2015, in force 1 January 2016; review of 29 September 2025 kept it valid |
| GB/T 20234.3 | DC charging coupler | 2023 | Published and in force 7 September 2023 |
| GB/T 20234.4 | High power DC charging interface (ChaoJi) | 2023 | Published 7 September 2023, in force 1 April 2024 |
- The AC coupler of GB/T 20234.2 is rated up to 440 V and 63 A according to its standard page summaries.
- The 2023 edition of the DC coupler, called "2015+" in the Chinese trade press, keeps the plug physically compatible with the 2015 one. Tencent News reported in October 2025 that it allows DC currents up to 800 A and charging above 500 kW through changes to the mechanics, the contact materials and the lock.
- GB/T 20234.4 is a separate, smaller connector for high power. TechNode reported in September 2023 that the approved ChaoJi interface supports up to 900 kW, and compared it with 250 kW for the existing GB/T DC coupler.
The ratings above come from secondary summaries of the standards. Check pin counts, currents and voltages against the texts of GB/T 20234.2, .3 and .4 before relying on them in a design.
The system and the messages
- GB/T 18487.1-2023 "Electric vehicle conductive charging system, Part 1: General requirements" was published on 7 September 2023 and applies from 1 April 2024, replacing GB/T 18487.1-2015. It covers classification, communication, protection against electric shock, the vehicle interface, adapters, emergency stop, marking and more.
- GB/T 27930-2023 "Digital communication protocols between off board conductive charger and electric vehicle" was published on the same day, applies from 1 April 2024 and fully replaces GB/T 27930-2015. It defines the physical, data link, transport and application layers of the CAN link between the charger communication controller (SECC) and the vehicle communication controller (EVCC).
- The People's Daily China Energy News reported in September 2023 that NARI Group led the drafting of the three ChaoJi national standards published that month.
ChaoJi is the joint work of the China Electricity Council (CEC) and the CHAdeMO Association. The two signed a collaboration agreement on 28 August 2018 that included co-developing an ultra fast charging standard. Japan publishes its side as CHAdeMO 3.0, released to CHAdeMO regular members on 24 April 2020 with a plug identical to the Chinese one and a maximum current of 600 A, as InsideEVs reported. ChaoJi and CHAdeMO 3.0 and Japan: CHAdeMO, Type 1 and the 300,000 port target tell the rest.
Certification: from CQC to CCC
Until 2025, certification of chargers in China was voluntary: CQC certification, issued by the China Quality Certification Centre, was something a maker chose. SAMR announcement 2024 No. 50 moved electric vehicle supply equipment into the compulsory CCC scheme.
| Date | Step |
|---|---|
| 24 July 2024 | GB 39752-2024 "Safety requirements of electric vehicle supply equipment" published |
| 1 March 2025 | Designated certification bodies start to accept CCC applications for EV supply equipment |
| 1 August 2025 | GB 39752-2024 and GB 44263-2024 "Safety requirements of electric vehicle conductive charging system" in force |
| 1 August 2026 | Equipment without a CCC certificate and mark may not leave the factory, be sold, imported or used in business |
The catalogue covers fixed and non fixed AC charging equipment and integrated, split, portable and mobile DC charging equipment, as Chinese national press, among them Xinhua, reported from the announcement. Makers holding CQC voluntary certificates were expected to convert them during the transition, as trade press summaries of the announcement put it. Both are mandatory national standards, hence the prefix GB without /T, which marks a recommended standard.
The power ranges and whether in cable control boxes fall under the CCC catalogue, and which bodies SAMR designated, are to be checked in the implementation rules of announcement 2024 No. 50.
Who writes the rules and how platforms talk
- National standards (GB, GB/T) are approved by SAMR and SAC. Energy sector standards for charging and swapping facilities carry the prefix NB/T 33; NB/T 33018-2015 on the power supply system of charging and swapping facilities, for example, lists State Grid, the China Electric Power Research Institute and NARI among its drafters.
- The China Electricity Council (CEC) develops ChaoJi with the CHAdeMO Association and publishes association standards with the prefix T/CEC.
- T/CEC 102-2016 "Information exchange of EV charging and battery swap service" has four parts: general principles, public information exchange, business information exchange, and data transmission and security. It unifies the interfaces through which charging service platforms of different operators, regions and third parties exchange information, so their facilities can be connected.
How a charger talks to its own operator's backend in China (OCPP, vendor protocols, or protocols published by large platforms) was not confirmed from a primary source for this page.
OCPP: the charger's link to its backend explains the protocol that most of the world uses for this link.
How many chargers, and who runs them
The China Charging Alliance (China Electric Vehicle Charging Infrastructure Promotion Alliance, EVCIPA) publishes monthly figures from its member reports, and the National Energy Administration publishes the national count. Both count charging points (枪, guns), not stations.
| End of August 2026 (NEA, EVCIPA) | Value |
|---|---|
| All charging points | 24.223 million, up 39.6 % in a year |
| Public charging points | 5.160 million, up 19.5 %; rated power 262 GW, about 50.7 kW per point |
| Private charging points | 19.063 million, up 46.3 % |
| Added January to August 2026 | 4.131 million, of which 443,000 public |
| Top ten provinces | Guangdong, Zhejiang, Jiangsu, Shandong, Shanghai, Fujian, Henan, Anhui, Sichuan, Hebei: 66.2 % of public points |
At the end of December 2025 the total had passed 20 million (20.092 million). EVCIPA's ranking of operators by charging points operated at that date:
| Operator | Points operated, December 2025 |
|---|---|
| TELD (特来电) | 899,000 |
| Star Charge (星星充电) | 732,000 |
| YKC (云快充) | 700,000 |
| Didi charging (滴滴充电, Xiaoju) | 315,000 |
| Weijingyun (蔚景云) | 264,000 |
| State Grid (国家电网) | 196,000 |
The top 15 operators held 82.2 % of the points in that ranking.
Battery swapping and bidirectional pilots
- GB/T 40032-2021 "Safety requirements of battery swap for electric vehicles" was published on 30 April 2021 and applies from 1 November 2021 to swappable M1 battery electric cars. It sets the safety requirements, test methods and inspection rules specific to swapping.
- A second part, GB/T 40032.2-2025, covers battery swappable commercial vehicles of classes N1, N2 and N3 and applies from 1 November 2025. The compatibility of swap systems is set in automotive industry standards, for example QC/T 1204.4-2024 for passenger cars (published 7 November 2024, in force 1 May 2025) and QC/T 1201.4-2023 for commercial vehicles.
- CATL's Choco-SEB network reported 2,520 swap stations in 31 provinces and 200 cities on 29 September 2026, with a target of more than 3,000 by the end of 2026. NIO also runs a network of passenger car swap stations.
Whether GB/T 40032-2021 has been renumbered as part 1, and NIO's station count (reported as 4,109 swap stations on 23 September 2026), are to be checked against SAMR and NIO's own releases.
On 13 March 2025 the National Development and Reform Commission, the NEA, the Ministry of Industry and Information Technology and SAMR named the first vehicle grid interaction pilots: nine cities (Shanghai, Changzhou, Hefei, Huaibei, Guangzhou, Shenzhen, Haikou, Chongqing and Kunming) and 30 projects, in residential areas, industrial parks, public stations and microgrids. Bidirectional charging: V2G, V2H, V2L explains the technique; Bidirectional charging: V2H, V2B, V2G and V2L in practice the business around it.
In this tool
- The analyzer reads GB/T 27930 sessions from CAN logs (candump and pcap). The gbt demo is a complete session; gbt-bst shows a BMS that stops with BST over connector temperature.
- GB-01 to GB-08 check the handshake order, timing, output against demand and limits, and the stop reasons. GB-08 reports, as information, when charger and BMS announce different protocol versions: V1.0 reads as 2011, V1.1 as 2015, a higher one as a later edition such as 2023.
- Messages new in GB/T 27930-2023 and ChaoJi decode as unknown for now, and the edition readings are marked for verification.
Sources
- Xinhua: EV supply equipment brought into compulsory CCC certification, 16 December 2024; fixed and non fixed AC equipment, integrated, split, portable and mobile DC equipment
- China Energy News (People's Daily): CCC certification for EV supply equipment, 30 December 2024
- Beijing News: GB/T 40032.2-2025 for battery swapping commercial vehicles applies from 1 November, 31 October 2025; N1, N2 and N3 vehicles
- Yangtse Evening Post: battery swap safety standard for commercial vehicles, 31 October 2025
- GB/T 20234.1-2023, conductive charging connection set, Part 1: General requirements, SAMR national standard record: published and in force 2023-09-07
- GB/T 20234.2-2015, Part 2: AC charging coupler, SAMR record: published 2015-12-28, in force 2016-01-01, review 2025-09-29 continue valid
- GB/T 20234.3-2023, Part 3: DC charging coupler, SAMR record: published and in force 2023-09-07
- GB/T 20234.4-2023, Part 4: High power DC charging interface, SAMR standards information platform
- GB/T 27930-2023, digital communication protocols between off board conductive charger and electric vehicle, SAMR record: published 2023-09-07, in force 2024-04-01, replaces GB/T 27930-2015
- GB/T 18487.1-2023, EV conductive charging system, Part 1: General requirements, SAMR record: published 2023-09-07, in force 2024-04-01, replaces GB/T 18487.1-2015
- Tencent News: the "2015+" series of charging standards, October 2025; plug compatibility, 800 A, above 500 kW
- TechNode: China approves the new ChaoJi DC charging standard, 26 September 2023; up to 900 kW against 250 kW
- China Energy News (People's Daily): three DC charging national standards led by NARI, 18 September 2023
- CHAdeMO Association: agreement for future standard collaboration signed with the China Electricity Council, 28 August 2018
- InsideEVs: CHAdeMO Association introduces CHAdeMO 3.0 protocol (ChaoJi), released 24 April 2020, 600 A
- SAMR announcement 2024 No. 50: compulsory product certification of EV supply equipment
- GB 39752-2024, safety requirements of electric vehicle supply equipment, published 2024-07-24, in force 2025-08-01
- GB 44263-2024, safety requirements of electric vehicle conductive charging system, in force 2025-08-01
- Sina Tech: CCC certification of EV charging equipment compulsory from today, 1 August 2026
- NB/T 33018-2015, technical specification for the power supply system of EV charging and battery swap infrastructure, industry standard record with drafters
- T/CEC 102.1 to 102.4-2016, information exchange of EV charging and battery swap service, China Electricity Council; report on the revision of the interoperability series, April 2018
- Science and Technology Daily: NEA, charging infrastructure at the end of August 2026, 23 September 2026
- Guangming Daily: more than 24 million charging points in China, 23 September 2026
- Sina Finance: China Charging Alliance, 2025 charging infrastructure and operator ranking, 21 January 2026; figures for December 2025
- GB/T 40032-2021, safety requirements of battery swap for electric vehicles, National Library of Standards record: published 2021-04-30, in force 2021-11-01
- GB/T 40032.2-2025, safety requirements of battery swap, Part 2: commercial vehicles, National Library of Standards record
- QC/T 1204.4-2024, compatibility of on board battery swap systems for battery electric passenger cars, published 2024-11-07, in force 2025-05-01
- Sina Tech: CATL Choco-SEB has built 2,520 swap stations, 29 September 2026
- NDRC, NEA, MIIT, SAMR: notice on the first vehicle grid interaction pilots, issued 13 March 2025, published 2 April 2025
- NEA: nine cities and 30 projects in the first vehicle grid interaction pilots, 25 April 2025