Kinds of chargers

From a portable cable on a household socket to a megawatt truck charger: the IEC 61851 charging modes, the North American levels, AC and DC wallboxes, split systems, battery buffered chargers, pantographs, MCS, wireless charging and battery swapping, and what each one looks like in a capture.

Modes and levels

IEC 61851-1 sorts conductive charging into four modes by how the car is connected and what protects it. The mode says nothing about the power: a Mode 3 wallbox and a Mode 4 truck charger can differ by a factor of a hundred.

ModeConnectionControl and protectionLimits
Mode 1Ordinary household or industrial socketNone in the cable; no Control PilotAt most 16 A, 250 V single phase or 480 V three phase; many countries forbid or restrict it
Mode 2Ordinary socket, through a cable with an IC-CPDThe IC-CPD (IEC 62752) generates the Control Pilot and adds residual current protectionAt most 32 A, 250 V single phase or 480 V three phase
Mode 3Dedicated AC supply equipment: a wallbox or a public AC charge pointControl Pilot and protection in the fixed equipmentSet by the installation and the cable (see Measured current, permitted current and the cable)
Mode 4Off-board DC chargerThe charger converts the power and controls it; CCS, CHAdeMO and GB/T DC are Mode 4Set by the charger, see IEC 61851-23: DC charging stations

North America uses the levels of SAE J1772 instead: AC Level 1 on 120 V, AC Level 2 on 208 to 240 V up to 80 A, and two DC levels for off-board chargers. SAE J1772: the North American coupler and pilot has the table.

"Level 3" is not one of those levels. It is the everyday name for DC fast charging in North America; in J1772 terms such a charger is DC Level 1 or DC Level 2. InsideEVs argued that the term is wrong; CleanTechnica argued in January 2023 that it is common enough to be legitimate. The analyzer does not use the term.

Early J1772 drafts are reported to have defined an AC Level 3 that was never used. Check this against the revision history of SAE J1772 before relying on it.

AC: wallboxes and portable cables

An AC charger does not convert energy; the onboard charger in the car does (see Inside a charger and The car side of charging). Its power is therefore the supply voltage times the current the pilot allows times the number of phases, and the car may take less.

  • Single phase at 230 V: about 3.7 kW at 16 A and 7.4 kW at 32 A.
  • Three phase at 400 V: about 11 kW at 16 A and 22 kW at 32 A. A car with a single phase onboard charger draws only on L1.
  • North America, split phase 240 V: up to 80 A under J1772, about 19 kW.
  • Mode 2 portable cable: the IC-CPD in the cable does what the wallbox does, on a smaller scale. In North America, Level 1 cord sets on 120 V work the same way.

Several wallboxes on one supply share it by lowering the duty cycle each one offers. The open source SmartEVSE controller, for example, shares one mains connection between up to eight units and raises or lowers the current it offers to each car. In a Control Pilot log that is a change of duty cycle in the middle of charging; PW-01 follows the permitted current as it changes.

DC: from wallbox to split system

  • DC wallbox: a small off-board charger on a wall or pedestal. ABB lists its Terra DC wallbox at up to 24 kW and its Terra 24 to Terra 54 at 20 to 50 kW; sites are depots, dealers and workplaces where the grid connection is limited.
  • All in one fast charger: the power modules, the controller and the cable sit in one cabinet. The ABB brochure lists Terra 94, 124 and 184 at 90, 120 and 180 kW.
  • Split system: a power cabinet with the rectifiers and DC/DC modules feeds one or more dispensers that hold the cable, the display and the communication controller. The cabinet shifts its modules between dispensers, so the power one car gets depends on what the others draw.
  • Battery buffered charger: a battery inside the charger is filled from a small grid connection or local solar and emptied into the car at high power. ADS-TEC Energy describes its ChargeBox (a separate battery booster with two dispensers) at up to 320 kW and its ChargePost (buffer and two charging points in one unit) at up to 300 kW.

To the car all of these look the same: an off-board DC charger with its limits. Power sharing and an emptying buffer show only as the limits the charger announces, for example a lower EVSEMaximumPowerLimit or EVSEPowerLimitAchieved set in the charge loop. The capture shows that the charger limited the power, not why.

Mobile chargers (a battery on a van, a trailer or a wheeled unit that charges a car where it stands) are sold as products, but their power ranges and interfaces were not confirmed for this page.

Buses and trucks: pantographs and MCS

SAE published J3105 in January 2020 for automated conductive connection devices, with three parts: J3105/1 for a pantograph on the infrastructure that comes down onto rails on the bus roof, J3105/2 for a pantograph on the vehicle that goes up to the infrastructure, and J3105/3 for an enclosed pin and socket connection. The IEC counterpart is IEC 61851-23-1:2026 for DC supply equipment with an automated connection device (ACD), up to 1 500 V DC on the vehicle side.

A pantograph has no plug to carry the pilot before contact, so bus and charger pair over WLAN as the bus approaches, and the charging communication follows ISO 15118. ISO 15118-20 has an ACDP service for this, with its own messages.

The published summaries of J3105 give two current levels, up to 600 A and up to 1 200 A, between 250 and 1 000 V, and name IEEE 802.11 for the pairing. Check the current levels, the WLAN variant and whether the session moves to the Control Pilot after contact against the SAE and IEC texts.

The Megawatt Charging System (MCS) is the plug for heavy trucks. SAE published J3271 as a technical information report in March 2025, and the IEC published IEC TS 63379 for the connector, inlet and cable in February 2026. The design target is up to 3 000 A and 1 250 V. The communication is ISO 15118-20 over 10BASE-T1S Ethernet, so there is no SLAC. MCS: the Megawatt Charging System covers it in detail.

Wireless charging and battery swapping

SAE J2954 sets the interoperability, safety and test requirements for wireless charging of light duty vehicles; its current revision is from August 2024. It defines three classes: WPT1 up to 3.7 kW, WPT2 up to 7.7 kW and WPT3 up to 11 kW. In the IEC, the IEC 61980 series covers the same ground, and IEC 61980-3 is written to work with ISO 15118-20.

Wireless charging needs communication before any power flows, to find and align the pad. ISO 15118-20 has a WPT service with its own messages, and ISO 15118-8 describes the wireless link that carries them (see ISO 15118-8: wireless communication).

Battery swapping replaces the pack instead of charging it in the car. IEC TS 62840-1 (2016) gives the general guidance for swap systems and IEC 62840-2 the safety requirements, published in Europe as EN IEC 62840-2:2025. electrive reported in January 2025 that DIN was working with NIO on a German standard based on this series. NIO reported that the first stations of its fourth generation Power Swap Station went live in June 2024, able to swap packs of several brands and models.

A swap station charges its packs inside the station. There is no car to charger session to capture at the station, and nothing in it for this analyzer.

Side by side

TypeTypical powerSupplyWhere usedCommunicationIn a capture for this analyzer
Mode 2 portable cableUp to 32 A (Mode 2 limit); Level 1 cord sets on 120 VHousehold or industrial socketHome, travel, emergencyControl Pilot PWM from the IC-CPDA CP log with a nominal duty cycle; no SLAC or V2G messages
AC wallbox (Mode 3)3.7 to 22 kW in Europe, up to about 19 kW in North AmericaMains, single or three phaseHome, workplace, streetPWM; optional ISO 15118-2 or -20 AC over PLC; OCPP to the backendCP log; with digital communication a 5 percent duty cycle, SLAC, SDP and the AC messages (An AC session, message by message)
DC wallboxAbout 20 to 50 kWThree phase ACDepots, dealers, workplacesCCS (DIN SPEC 70121, ISO 15118); CHAdeMO or GB/T over CAN where fittedA DC session: CableCheck, PreCharge, the charge loop (A DC session, message by message), or CAN frames
All in one DC fast chargerTens to a few hundred kW (ABB lists 90 to 180 kW)Three phase ACHighway, retail, urban hubsAs the DC wallbox; OCPP to the backendAs the DC wallbox; the power limits reflect the modules
Split system (cabinet and dispensers)Shared between dispensersThree phase AC to the cabinetHighway, depots, bus and truck sitesThe communication controller sits in the dispenserAs the DC wallbox; power sharing shows only as changing limits
Battery buffered chargerUp to about 300 kW from a small grid connectionLow power AC plus an internal batterySites with a weak gridAs the DC wallboxAs the DC wallbox
Pantograph (ACD)Several hundred kW (see the verify note above)GridBus depots and route endsWLAN pairing, ISO 15118; ISO 15118-20 ACDPV2G messages without HomePlug frames; the ACDP messages of ISO 15118-20 are decoded
MCSUp to 3 000 A and 1 250 V by designGridTruck depots and corridorsISO 15118-20 over 10BASE-T1SV2G messages without SLAC; the MCS specific parts are not decoded
Wireless (WPT)3.7, 7.7 or 11 kW (J2954 WPT1 to WPT3)Mains to the ground padHome and fleet parkingISO 15118-20 WPT over a wireless linkThe WPT messages of ISO 15118-20 are decoded when the IP traffic is captured
Battery swap stationNot applicableGridStations run by a car maker, for example NIOInside the stationNothing to capture

In this tool

  • A Control Pilot log from any Mode 2 or Mode 3 charger is read with the CP, PW and PP checks. The limit profile for IEC 61851-1 or for SAE J1772 and J3400 is suggested from the EVSEID country or a North American supply voltage (Limit profiles: the numbers behind every check).
  • A network capture from an AC or DC charger with digital communication is read from SLAC to SessionStop. The demos ac-ok and iso20 show both.
  • CHAdeMO and GB/T sessions are read from their CAN frames, from a pcap or a CAN text log; see the chademo and gbt demos.
  • On a link without HomePlug, such as MCS, a pantograph or wireless, SLAC shows as not in the capture instead of failed, and the session facts name the link (FR-STD-02).
  • The ACDP and WPT messages of ISO 15118-20 are decoded with the same codec as the AC and DC messages.
  • What happens inside a split system or a battery buffer, and the backend, is not on the charging cable. An OCPP log of the charger can be loaded beside the capture (OCPP 2.0.1 and ISO 15118: the backend behind the cable).

Sources