India: from Bharat chargers to CCS2, IS 17017 and PM E-DRIVE

India began with the low power Bharat AC-001 and DC-001 chargers of 2017 and moved to Type 2 and CCS2 for cars, written into the IS 17017 series of BIS, which also holds light EV connectors such as LECCS. The Ministry of Power guidelines of 17 September 2024 set tariffs, open protocols and station density; FAME II and PM E-DRIVE fund public chargers.

At a glance

Charging in India grew in two layers. The first public chargers of the late 2010s followed the Bharat specifications: low power AC outlets and a 15 kW DC charger for low voltage cars, using a GB/T connector and CAN messages. Cars with larger batteries brought CCS2 and Type 2, the European connectors, which the Bureau of Indian Standards (BIS) adopted in the IS 17017 series. Two and three wheelers got their own connectors in the same series.

Bharat AC-001 and DC-001

A committee on the standardisation of charging protocols, set up by the Department of Heavy Industries (DHI), recommended specifications for AC and DC charging in December 2017. They became known as Bharat Charger AC-001 and DC-001.

SpecificationWhat it is
Bharat AC-001Three outlets of 3.3 kW (15 A) each on IEC 60309 industrial sockets, for three vehicles at the same time
Bharat DC-00115 kW, up to 200 A, output of 48 V, 60 V or 72 V for low voltage batteries; GB/T 20234 connector; CAN communication based on GB/T 27930 with commands added by DHI

Because DC-001 reuses the GB/T 27930 message set, GB/T 27930: the Chinese DC protocol and China: GB/T charging, CCC certification and the largest charging network explain most of what happens on its CAN bus. Operators later added 30 to 50 kW CCS2 chargers next to their Bharat units, and EVreporter has written on whether DC-001 has a future beside CCS2.

The added DC-001 messages and the exact electrical ratings come from secondary sources (EVreporter, EAI and a BEL product leaflet); check them against the DHI specification text.

IS 17017 and the other Indian standards

BIS publishes the Indian standards for conductive charging as IS 17017, largely aligned with IEC 61851 and IEC 62196, and adopts the ISO 15118 series as IS 15118. EVreporter notes that the DHI approved Bharat specifications are recognised beside the IS 17017 parts.

StandardSubjectEdition
IS 17017 Part 1General requirements (based on IEC 61851-1)2018
IS 17017 Part 2 Sec 2Dimensional compatibility of AC pin and contact tube accessories (Type 2 family)2020
IS 17017 Part 2 Sec 3Dimensional compatibility and interchangeability of DC and AC/DC pin and contact tube vehicle couplers2020
IS 17017 Part 2 Sec 6Type 6: DC connector for light EVs, 100 A, available up to 125 A2021
IS 17017 Part 2 Sec 7Type 7 (LECCS): combined AC (up to 7 kW) and DC coupler for light EVs2023, approved October 2023
IS 17017 Part 22 Sec 1AC charge point for light EVs2021
IS 17017 Part 23DC EV supply equipment2021
IS 17017 Part 24Digital communication between DC EVSE and EV for control of DC charging2021
IS 17017 Part 25DC EVSE where protection relies on electrical separation (low voltage light EVs)2021
IS 17017 Part 30Dual gun DC EVSE2025
IS 15118 Parts 1, 2, 3, 4, 5, 8Adoptions of ISO 15118: use cases, network and application protocol, PLC, conformance tests, wirelessvarious

For CCS the communication follows the IS 15118 series, the Indian adoption of ISO 15118-2: the first generation application layer and its companions. LECCS (Type 7) and Type 6 serve light EVs such as two and three wheelers.

The LECCS communication layer was not confirmed from the BIS catalogue. Charging operators write that BIS certification under IS 17017 is mandatory for chargers sold in India; no quality control order confirming this was found. Check both in the BIS compendium of EV charging standards.

Ministry of Power guidelines

The Ministry of Power issued the "Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024" on 17 September 2024 (file No. 12/2/2018-EV). They supersede all earlier versions and apply from their issue to public, semi public and private charging.

  • Setting up and running a charging station is a de-licensed activity: no electricity licence is needed.
  • Distribution utilities must connect a station within 3 to 90 days, depending on the area.
  • The tariff for charging stations is single part and may not exceed the average cost of supply (ACoS) until 31 March 2028. Summaries report 0.7 times ACoS during solar hours (9:00 to 16:00) and 1.3 times outside them.
  • Density: at least one public station in each 1 km by 1 km grid in cities by 2030; on highways a station every 20 km, and every 100 km for long range and heavy vehicles.
  • New public chargers are to support open protocols: OCPP between charger and management system, OCPI for roaming between networks, as charging operators summarise the guidelines.

The protocol versions the guidelines name, the date of the density targets and the solar hour factors were taken from summaries by the trade press and charging operators; check them in the gazette text.

OCPP: the charger's link to its backend describes the charger to backend protocol; Highway and urban fast charging hubs what highway sites need.

FAME II and PM E-DRIVE

ProgramWhat it funds for chargingDates and source
FAME India Phase IIRs 1,000 crore allocated for charging infrastructure. Sanctioned: 2,877 stations in 68 cities across 25 States and UTs, and 1,576 across 9 expressways and 16 highwaysFive years from 1 April 2019; sanctions announced March and July 2022 (Ministry of Heavy Industries)
PM E-DRIVERs 2,000 crore of a Rs 10,900 crore scheme for about 72,300 public charging stations; BHEL is the project implementation agencyOperational guidelines for charging published September 2025
PM E-DRIVE extensionScheme runs to 31 March 2028 with Rs 11,900 crore in all; claims to be filed by 31 December 2027Reported 11 August 2026
  • Under the PM E-DRIVE charging guidelines, government premises such as offices, residential complexes, hospitals and colleges get 100 % of the upstream infrastructure and the charging equipment paid, if the chargers offer free public access.
  • Elsewhere the subsidy covers 80 % of the upstream infrastructure and 70 % of the charging equipment.
  • Ministries and state governments appoint nodal agencies that collect demand and send proposals to the Ministry of Heavy Industries.

Later parliamentary answers give Rs 912.50 crore as the FAME II amount for public charging, against the Rs 1,000 crore allocation. Use the latest ministry figure.

How many chargers

The Minister of State for Heavy Industries told the Lok Sabha in July 2026 that 52,718 public charging stations were operational in India, of which 16,561 had fast chargers for cars.

An earlier ministry figure for March 2026 gave 27,737 stations installed and 22,753 operational. The two counts probably differ in what they include (stations, chargers, sources); check the definitions in the parliamentary answers before comparing them.

In this tool

  • CCS2 sessions speak DIN SPEC 70121 or ISO 15118-2 (IS 15118) over PLC. The analyzer reads them from a pcap with the SL, HS and later checks; the ac-ok demo is an AC session of that kind.
  • The shipped default limit profile (IEC 61851-1 and ISO 15118-2, 230 V nominal) applies; where a supply differs, copy a profile and set its voltage. See Limit profiles: the numbers behind every check.
  • Bharat DC-001 builds on GB/T 27930, which the GB/T module decodes from CAN logs (see the gbt demo). The analyzer has no DC-001 profile: messages DHI added decode as unknown, and no DC-001 capture was tested.
  • LECCS and Type 6 light EV sessions are not decoded as protocols of their own.

Comparison table

AspectIndia
AC connectorType 2 (IS 17017 Part 2 Sec 2) for cars; Bharat AC-001 on IEC 60309 sockets; Type 7 (LECCS) for light EVs
DC connectorsCCS2 for cars; Bharat DC-001 (GB/T 20234 connector, 15 kW); Type 6 and Type 7 (LECCS) for light EVs
CommunicationIS 15118 (ISO 15118) and DIN SPEC 70121 over PLC for CCS2; CAN based on GB/T 27930 for DC-001; IS 17017 Part 24
BackendOCPP to the management system and OCPI for roaming, per the Ministry of Power guidelines of 2024
Key rules with datesBharat specifications December 2017; Ministry of Power guidelines 17 September 2024; ACoS tariff cap to 31 March 2028; FAME II from 1 April 2019; PM E-DRIVE to 31 March 2028
Test and certificationBIS (IS 17017, IS 15118); Ministry of Heavy Industries for scheme eligibility

See also Charging around the world, China: GB/T charging, CCC certification and the largest charging network for the GB/T roots of DC-001, Japan: CHAdeMO, Type 1 and the 300,000 port target, GB/T 27930: the Chinese DC protocol, CHAdeMO: DC charging over CAN, ISO 15118-2: the first generation application layer, OCPP: the charger's link to its backend, Safety and type approval of chargers and cars and Highway and urban fast charging hubs.