South Korea: Combo 1, KC certification and smart control chargers

South Korea charges on the Type 1 AC connector and on Combo 1 (CCS1), which the government made the single DC method in a KS revision after 2016. Chargers are KC safety checked, the climate and environment ministry funds most public chargers, and since 2025 subsidised slow chargers must read battery data over PLC with the ISO 15118-2 based K-VAS protocol, a fire safety measure.

At a glance

Korea sits between its neighbours in how it charges. Japan kept CHAdeMO and China its GB/T system (see Japan: CHAdeMO, Type 1 and the 300,000 port target and China: GB/T charging, CCC certification and the largest charging network); Korea chose the North American connector family: Type 1 for AC and Combo 1 (CCS1) for DC, where charger and car talk over powerline communication like the rest of the CCS world. Public charging is funded mostly through the national environment ministry, and concern over battery fires in underground car parks has shaped both the chargers and the building rules.

Connectors: one DC method since the KS revision

Before the revision, three fast charging methods were in use side by side in Korea: CHAdeMO, three phase AC and Combo 1. The Korean Agency for Technology and Standards (KATS), under what was then the Ministry of Trade, Industry and Energy, gave notice of a revision of the Korean Industrial Standards (KS) for EV charging that makes Combo 1 the single DC method, as the government briefing and the Electric Times reported. The advance notice is dated 29 December 2016, and the final KS was expected in April 2017 after comments from stakeholders, according to press reports of 28 December 2016.

The date on which the final KS notice was issued and the KS numbers adopting IEC 61851 and IEC 62196 were not confirmed from the KS catalogue. Check both before quoting them.

Who does what: ministry, K-eco, KC and the backend

  • The Ministry of Environment funds and plans public charging. The Government Organization Act amendment passed on 26 September 2025 widened it into the Ministry of Climate, Energy and Environment from 1 October 2025, taking over energy functions from the trade and industry ministry.
  • The Korea Environment Corporation (K-eco) installs and runs public slow and fast chargers with local governments and public bodies, as its 2024 sustainability report describes.
  • The zero emission vehicle portal ev.or.kr, set up under the Clean Air Conservation Act, publishes the charger statistics and collects the status, energy and price data of chargers nationwide into one platform.
  • KC safety marking: EV chargers are electrical products under the Electrical Appliances and Consumer Products Safety Control Act. KTR lists them as products for safety confirmation up to 200 kVA; KTL and KTC test them. Business Korea (bizhankook) reported that ultra fast chargers above that range could not get a KC mark, which left a gap in their safety checks.
  • Backend: Asia Economy reported in May 2025 that the environment ministry made OCPP 1.6 certification a condition in its charger programs. In May 2026 Money Today reported that H Charger Lab, a Hyundai spin off, got OCPP 2.0.1 certification for its smart control slow charger. OCPP: the charger's link to its backend and OCPP certification describe the protocol and its test.

The year from which OCPP 1.6 certification became a condition of the subsidy program, and whether the rule covers OCPP 2.0.1, were not confirmed from a ministry notice. What KC now requires for chargers above 200 kVA was not checked either.

Safety and type approval of chargers and cars explains what a safety type test covers in general.

Smart control chargers: K-VAS over PLC

To lower the risk of battery fires, the ministry added a budget line for "fire prevention" slow chargers. Newsis reported in August 2024 that such a charger carries a PLC modem, reads the battery state from the car and cuts the charge at a set level; the Electric Times described chargers that stop at 95 % state of charge. The ministry budget for 2025 foresaw that only slow chargers with a PLC modem, called smart control chargers, would be installed with new money.

  • The protocol is K-VAS, the smart control charging battery information exchange protocol. Money Today reported in May 2026 that it is based on ISO 15118-2 and has been mandatory in the ministry charger program since 2025.
  • The data exchanged, according to maker descriptions: state of charge, voltage, current and temperature at set intervals, sent on to a battery data management system; the charger receives charge control information back.
  • Modem makers reported certifications of their PLC modems for these chargers in 2025, for example Gridwiz in August 2025.

ISO 15118-2 AC messages carry no state of charge; the DC messages do. How K-VAS gets the battery values over an AC session (extra messages, extended fields or a DC style exchange) was not checked against its specification.

Fire safety in underground car parks

The government announced further EV fire measures on 27 February 2025. Policy briefing and press reports describe these rules for car parks:

  • All underground car parks get fire extinguishing and alarm systems, wet pipe sprinklers that stay filled with water, and extinguishing pipes with at least flame retardant insulation.
  • EV charging zones get analogue smoke detectors, to detect fast and avoid false alarms, and quick response sprinkler heads, at least two per parking space.
  • The Seoul Metropolitan Government published a plan to keep EVs charged above 90 % out of the underground car parks of apartment buildings.

A vendor summary gives 1 March 2026 as the date from which the charging zone rules are binding. The date, the scope (new or existing buildings) and the current status of the Seoul 90 % rule are to be checked against the National Fire Agency and Seoul notices.

Counts and programs

CountValueDate and source
Chargers installed34,714end of 2020, Korea Economic Daily (Hankyung), February 2025
Chargers installed394,132, with 684,244 EVs registered: about 1.7 EVs per chargerend of 2024, same report
Chargers installed541,567: 59,652 fast and 481,915 slowreported in 2026 in coverage of the ministry program
2026 program4,450 fast (383.2 billion won), 2,000 medium speed (30 billion won), 65,000 slow of which 15,000 replacements (132.5 billion won); 545.7 billion won in allMinistry of Climate, Energy and Environment, reported January 2026
  • The medium speed class (30 to 49 kW) is new; Energy News reported the 2,000 unit plan for it in 2026.
  • A 2026 overview by Getcha splits the chargers by power: slow below 30 kW, medium 30 to 49 kW, fast 50 to 99 kW and 100 to 199 kW, and ultra fast from 200 kW.
  • Seoul Shinmun reported on 22 September 2026 that the installation target of 2025 had been missed.

The month of the 541,567 count was not given in the summary used for this page; take the current figure from the ev.or.kr dashboard.

In this tool

  • A Combo 1 session speaks DIN SPEC 70121 or ISO 15118-2 over PLC, which the analyzer reads from a pcap like any CCS capture. The SL checks follow SLAC, HS-01 to HS-03 the protocol negotiation, and the CP checks the Control Pilot log.
  • The ac-ok demo is an ISO 15118-2 AC session; precharge-fail is a DC session that stalls in pre-charge.
  • K-VAS is based on ISO 15118-2. The analyzer decodes the standard ISO 15118-2 schema only; K-VAS extensions, if a capture carries them, were not tested.
  • The shipped limit profiles assume 230 V (IEC defaults) or 240 V (SAE J1772 and J3400). Where the local supply differs, copy a profile and set the nominal voltage; see Limit profiles: the numbers behind every check.

Comparison table

AspectSouth Korea
AC connectorType 1 (SAE J1772, IEC 62196-2), single phase
DC connectorsCombo 1 (CCS1), the single DC method after the KS revision; older CHAdeMO and three phase AC chargers from before
CommunicationDIN SPEC 70121 and ISO 15118-2 over PLC; K-VAS (based on ISO 15118-2) for smart control slow chargers since 2025
BackendOCPP 1.6 certification in the ministry charger program (reported May 2025); OCPP 2.0.1 certified products since 2026
Key rules with datesCombo 1 KS revision (notice at the end of 2016, final about April 2017); smart control chargers in the program from 2025; underground car park fire measures announced 27 February 2025; ministry renamed 1 October 2025
Test and certificationKC safety confirmation (KTL, KTC, KTR) up to 200 kVA; OCPP certification; KATS for KS standards

Compare with Japan: CHAdeMO, Type 1 and the 300,000 port target (CHAdeMO), China: GB/T charging, CCC certification and the largest charging network (GB/T) and the overview in Charging around the world. The message level is in ISO 15118-2: the first generation application layer and CHAdeMO: DC charging over CAN, the charger to backend link in OCPP: the charger's link to its backend, safety tests in Safety and type approval of chargers and cars, and fast charging along roads in Highway and urban fast charging hubs.