Home charging
Charging where the car is parked overnight: mode 2 cables and mode 3 wallboxes, the limits of a house connection, load management and solar surplus charging, the UK smart charge point rules, the EU building directive and US programs, and what to record when a home session fails.
The setting
A car parked for many hours at a house or an apartment block, charged on AC through the onboard charger. The people involved are the driver (often the owner of the charge point), the installer, the network operator who owns the house connection, the energy supplier whose tariff sets the cheap hours, and, more and more often, an energy manager or app that decides when the car charges.
| Equipment | What it is | Typical power |
|---|---|---|
| Mode 2 cable | A cable with an in-cable control and protection device (IC-CPD) that plugs into a household or industrial socket. IEC 62752 covers the device: residual current protection and a Control Pilot function to IEC TS 62763, for single phase up to 250 V or multiphase up to 480 V and at most 32 A. | Limited by the socket; a household socket is the slow case |
| Mode 3 wallbox (Europe) | A fixed charger with a Type 2 socket or tethered cable. The evcc documentation notes that most wallboxes are connected three phase for 11 kW or 22 kW. | 11 or 22 kW on three phases, less on one |
| Level 1 and Level 2 (North America) | SAE J1772 (and J3400 with the same Control Pilot): Level 1 at 120 V up to 16 A (1.92 kW), Level 2 at 208 to 240 V up to 80 A (19.2 kW), as summarised by Monta. Home units commonly run at 32 or 40 A. | 1.4 to 19.2 kW |
Charging modes, the Control Pilot and the cable coding are explained in IEC 61851-1: the Control Pilot and Measured current, permitted current and the cable; the North American side in SAE J1772: the North American coupler and pilot and SAE J3400: the NACS coupler. The range of charger types is on Kinds of chargers.
Load management and solar surplus
A house connection is sized for the house, not for a car on top of an electric cooker and a heat pump. A wallbox with load management measures the current at the meter and lowers its own offer (the PWM duty cycle) so that the connection fuse does not trip. Solar surplus charging uses the same lever the other way round: it raises and lowers the offer to follow what the panels produce beyond the house load.
- The lowest current a car accepts is 6 A per phase, from IEC 61851-1. The evcc documentation turns that into a minimum charging power of 1.4 kW on one phase and 4.1 kW on three phases at 230 V.
- Below that minimum, surplus charging either pauses or draws the rest from the grid. Wallboxes that switch between one and three phases start at 1.4 kW, which is why phase switching is common in solar setups.
- Every change of the offer is a change of the duty cycle. IEC 61851-1 gives the car a few seconds to follow; the analyzer uses 5 s (
pw.settlingTimeS, Table A.6 sequence 6) before PW-01 calls an excess a breach. - Pauses are where cars differ. A study in Nature Communications (June 2024) found that around one third of the car models tested had paused or delayed charging problems: they went to sleep during a pause and did not resume. Smart charging: schedules, limits and grid signals has the detail.
Phase switching means the charger opens its contactor, changes the phase count and closes it again while the car stays plugged in. How long the charger waits in state B or with a 100 percent duty cycle between the two, and how a given car reacts, is not set by one rule; test it with each car you support.
Rules by region
| Region | Rule or program | What it asks of a home charger |
|---|---|---|
| European Union (Europe: AFIR, Type 2, CCS2 and ISO 15118) | Directive (EU) 2024/1275 (EPBD recast), Article 14 | New residential buildings and those under major renovation get pre-cabling and ducting for recharging points, and recharging points must be capable of smart charging and, where appropriate, bidirectional charging. Member States must also remove barriers to installing recharging points in multi-apartment buildings. |
| Germany (Europe: AFIR, Type 2, CCS2 and ISO 15118) | Section 19 NAV; section 14a EnWG | Every wallbox is registered with the network operator; above 12 kVA the operator must agree first (VDE FNN). Since 1 January 2024, new private charge points above 4.2 kW are controllable devices: the network operator may reduce them in a threatened overload, but not below 4.2 kW (Bundesnetzagentur). |
| Great Britain (United Kingdom: smart charge points, the Public Charge Point Regulations and Type 2 with CCS2) | Electric Vehicles (Smart Charge Points) Regulations 2021 | Applies to private (domestic and workplace) charge points sold from 30 June 2022, not to public or rapid ones. The charger must be smart, come with pre-set default charging hours outside the peak hours of 8:00 to 11:00 and 16:00 to 22:00 on weekdays that the owner can accept, change or remove, and start with a random delay of up to 10 minutes (capable of up to 30). It measures the energy it transfers. The security requirements of Schedule 1 apply from 30 December 2022. |
| United States (North America: J1772, CCS1, J3400 and the NEVI standards) | Section 30C credit; ENERGY STAR; utility programs | The 30C credit (30 percent of the cost, up to 1,000 USD, for a charger at the main home in an eligible low income or rural census tract) no longer applies to property placed in service after 30 June 2026 (IRS, Form 8911 instructions). ENERGY STAR certifies Level 1 and Level 2 chargers; its connected criteria name OCPP, SEP 2.0, CTA-2045A and OpenADR 2.0 for demand response, and some rebate programs require the label. |
Utility programs pay for charging at the right time rather than for the hardware. Two examples as their own pages describe them: Xcel Energy in Colorado pays up to 500 USD towards a Level 2 charger (up to 2,300 USD for income qualified customers) for customers enrolled in its Optimize Your Charge program; the NV Energy managed charging handbook asks for a networked Level 2 charger or car telematics and pays in each month in which at least 80 percent of home charging falls in off peak hours.
The EPBD counts (how many recharging points and pre-cabled spaces per building size) are left out here: check Article 14 and the national law, which member states had to adopt by 29 May 2026. Program amounts change every year.
Communication and backend
- Most home sessions use the Control Pilot only: the duty cycle offers a current and the car takes it. There is no state of charge, no departure time and no identity on the cable.
- ISO 15118-2 over AC adds a departure time and an energy amount (
DepartureTime,EAmountinAC_EVChargeParameter) and a power schedule from the charger. ISO 15118-20 adds scheduled and dynamic control and, for bidirectional cars,AC_BPT(ISO 15118-20: control modes, BPT and power profiles). - The wallbox reaches its app or operator over Wi-Fi, Ethernet or mobile data, often with OCPP (OCPP: the charger's link to its backend). Smart functions (default hours, tariffs, grid signals) run there, not on the cable.
- Solar surplus and load management need a meter reading at the grid connection, read locally by the wallbox or an energy manager.
What fails at home
- Connectivity. The J.D. Power 2025 U.S. EVX Home Charging Study (March 2025) found that 31 percent of the problems with permanently mounted Level 2 home chargers came from internet or Wi-Fi connectivity and charger apps; satisfaction scored 733 for permanently mounted and 714 for portable Level 2 chargers on a 1,000 point scale.
- Scheduled or surplus charging that never resumes: the car slept through a pause (Nature Communications, 2024).
- An IC-CPD that refuses to start because it finds a supply fault, which IEC 62752 lets it do.
- Worth testing even without field numbers: a car that draws more than the duty cycle offers after a change, or keeps drawing after it asked to stop (PW-01 and PW-03 in a capture with current channels).
What to record and test
- A Control Pilot log with the current of each phase (shape A with
i_l1toi_l3, or a processed log with duty and state), and the network capture if the charger speaks ISO 15118. Recording a charging session for analysis explains the setup. - The wallbox log or its OCPP log for the same time, so a pause can be told apart from a charger fault.
- Tests worth running per car: a start delayed by default hours, a duty cycle stepped between 6 A and the maximum, a pause of several minutes at 0 A and the resume, a one to three phase switch, and an unplug during charging. AC test cases, worked writes such cases out.
In this tool
- The ac-ok demo is an AC ISO 15118-2 session with a Control Pilot log and an OCPP log: open it to see the duty cycle, the states and the current on one timeline.
- The CP quality tab and CP-01 to CP-10 judge the Control Pilot itself: frequency, plateaus, allowed duty values and state changes. PP-01 reads the cable coding.
- The Power tab draws the permitted current (duty cycle, cable rating, announced maxima and schedule) against the measured current; PW-01, PW-02, PW-03 and PW-05 judge it. A current change after a new duty cycle has
pw.settlingTimeSto settle. - A home session without ISO 15118 gives the tool only the Control Pilot log; the verdict then rests on the CP and power checks. For the North American supply, the analyzer offers the SAE J1772 and J3400 limit profile (Limit profiles: the numbers behind every check).
Sources
- IEC 62752, in-cable control and protection device (IC-CPD) for mode 2 charging; catalogue summary
- IEC 61851-1:2017, charging modes 2 and 3, Control Pilot duty cycle and current
- Monta: SAE J1772 charging levels, Level 1 at 120 V up to 16 A, Level 2 at 208 to 240 V up to 80 A
- evcc documentation: Solar charging, minimum 6 A per IEC 61851, 1.4 kW single phase and 4.1 kW three phase, phase switching
- VDE FNN: E-Mobilitaet FAQ, NAV section 19: registration of charging devices, consent of the network operator above 12 kVA
- Bundesnetzagentur: Integration von steuerbaren Verbrauchseinrichtungen (section 14a EnWG), from 1 January 2024; devices above 4.2 kW; reduction to no less than 4.2 kW
- The Electric Vehicles (Smart Charge Points) Regulations 2021 (SI 2021/1467), Part 2 and Schedule 1: smart functionality, default charging hours, randomised delay, security
- OZEV: Guide to the Electric Vehicles (Smart Charge Points) Regulations 2021, version 2.1, scope: private domestic and workplace charge points; public and rapid charge points excluded
- GOV.UK: Regulations: electric vehicle smart charge points, in force 30 June 2022; Schedule 1 security requirements from 30 December 2022
- Directive (EU) 2024/1275 on the energy performance of buildings (recast), Article 14, infrastructure for sustainable mobility
- Directive (EU) 2024/1275, Article 35, transposition by 29 May 2026
- AVERE: Guide to the revised Energy Performance of Buildings Directive, April 2024; recharging points, pre-cabling, smart and bidirectional charging
- IRS: Instructions for Form 8911 (12/2025), section 30C credit; termination moved to 30 June 2026 by P.L. 119-21
- CHARGED EVs: An ENERGY STAR charger specification program update, connected criteria, demand response through OCPP, SEP 2.0, CTA-2045A or OpenADR 2.0; rebates that require the label
- Natural Resources Canada: release of the ENERGY STAR Version 1.2 EVSE specification, 11 August 2023; requirements effective 20 June 2023
- Qmerit: Colorado EV rebates and charging incentives, Xcel Energy Optimize Your Charge: up to 500 USD, up to 2,300 USD for income qualified customers
- NV Energy: Residential Managed Charging Program Handbook, networked Level 2 charger or telematics; incentive for months with 80 percent or more of home charging off peak
- J.D. Power: 2025 U.S. Electric Vehicle Experience (EVX) Home Charging Study, press release, 25 March 2025
- Brinkel, van Wijk, van Sark et al.: Enhancing smart charging in electric vehicles by addressing paused and delayed charging problems, Nature Communications, 25 June 2024